Amento, Newmarket, Suffolk

Amento, designed by award winning Architect, James Gorst, is a contemporary, single-storey, open plan house.
The facing brick faced diaphragm walls divide the house into four areas – the master bedroom, bathroom and study; the dining and entertaining areas; the accommodation quarter for guests and the fourth quarter for the garage and utilities.

  • Sector: Residential
  • Location Newmarket, Suffolk
  • CLIENT: Private
  • Architect: James Gorst Architects
  • Structural Engineer: Structure Workshop
  • commenced: April 2022
  • Completed: April 2023
  • Procurement Method: Single Stage Drawings and Specification
  • Contract Value: £1,050,000

The roof sheets, gutters and pipe work are all constructed from Zinc and a gravity rainwater drainage system uses chain downpipes.
Internally, the house features Douglas Fir plywood panelling throughout with a 2mm joint all round. Some of the panels are removeable with hidden fixings, for example, above the windows to conceal the electric blinds. There is open rafter detailing throughout with a sarking layer of Douglas Fir plywood.

Polished concrete floors by Lazenby with a rich walnut satin finish are throughout.
LED lighting is used throughout the house. The wood burner in the living area sits on a marble shelf which seamlessly adjoins wooden cabinetry running the width of the room with inset LEDs. A marble backdrop to the wood burner sits flush to the Douglas fir panelling.
In the kitchen, bespoke cabinetry by Buhr was constructed using Douglas Fir contrasting with worktops made from white stone.
The master bedroom features bespoke cabinetry by Buhr, again using Douglas Fir with a Cedar lining while the en-suite shower room features a roof light.
Imported Japanese tiles are used with white sanitaryware in the family WC.
Sliding pocket doors are fitted between the hall and study, the master bedroom and living area through to the other bedrooms.

Amento won the RIBA Suffolk Craftsmanship Award, 2024.

Amento

“It was a pleasure working with Gipping and we are very happy with our new home. Shaun Whiting was an exceptional Site Manager and remained professional, approachable and friendly throughout the entire build. The site was always tidy, well-managed and busy. We felt as if the entire Gipping team took our project seriously and truly cared about getting the build right. I would highly recommend you to anyone who is considering building a home.”

Elizabeth Goodrich, Amento

What Our Clients Say

  • “Peter was outstanding when it came to communications and implementing changes and fixes that were required by the building work supplier. Very happy to recommend Gipping's services to others.”

    Oliver Squirrell, Old Jet Airspace Programme

  • “I just wanted to thank you again for pretty much everything! I absolutely love our home and it was totally worth the wait. There isn’t a single thing I’d change, it really is perfect. The landscapers have been now too and it’s totally transformed the outside space, it just looks incredible. I feel super lucky to live here, every time I pull up back home I smile and feel so grateful and lucky.  All the workmen have been incredibly lovely and gone above and beyond too, you have such a great team of people, they are extremely lovely and that makes a huge difference. I wish you well in all that you do creating beautiful homes for people. Thank you so so much.”

    Kayleigh Williams: Wix

  • “As a team, Gipping met every expectation throughout the project. Steve James provided the exact role and attitude required for a project of this nature. The way he managed the works on site, given the difficult “live” environment was a credit to the firm. The overall management and support for Steve from Steve Offord and Joe was also a large factor in the smooth running of the scheme. All involved should be commended and are a credit to Gipping. Thank you for your part in a very successful scheme.”

    Ben Mitchell, The Design partnership: Walden Place

  • “Carl, and the team, were fantastic during this phase of the project. Carl kept us updated with how the work was going and always had time to check with us if he thought things would impact on the running of the school. The site was always clean and tidy. The project was delivered slightly ahead of schedule, which made the transition into the build much easier for us! Thank you!”

    Hannah Brookman, Tollgate Primary School Phase I

  • “It was a pleasure working with Gipping and we are very happy with our new home. Shaun Whiting was an exceptional Site Manager and remained professional, approachable and friendly throughout the entire build. The site was always tidy, well-managed and busy. We felt as if the entire Gipping team took our project seriously and truly cared about getting the build right. I would highly recommend you to anyone who is considering building a home.”

    Elizabeth Goodrich, Amento