Full internal refurbishment of the existing office building including lift installation, heating and ventilation, partitioning, finishes and fixtures and fittings on behalf of Allied Health.
Works were carried out in three phases to allow the Employer to continue occupation during the construction.
The alteration works included the removal of suspended ceilings, construction of timber stud partitions to form four rooms, providing doors, repositioning of light fittings and supplying new wash hand basin.
We formed a lift shaft and pit including removing a section of brickwork and an aluminium window to create access into the working area.
We carried out alteration works to the first floor to create six new treatment rooms, a group room, a waiting area and a lift lobby.
This included M&E amendments and fitting new male toilet facilities. The enabling work for the new facilities required external drainage to be installed back to an existing foul drain run.
Alteration works to the ground floor comprised three new treatment rooms, an office/meeting room, a gym, staff room, comms room and reception area. Works included the removal of temporary partitions installed in Phase One.