Works comprised of completion of a refurbishment to two adjacent car showrooms for Toomey’s Nissan and Hyundai dealerships. New M & E installation including ventilation and cooling, lining of walls, fully tiled showroom floors, suspended ceilings and decoration, all around live car showroom open to the public.

  • Sector: Commercial and Industrial
  • Client: George Martin Ltd
  • Location: Basildon, Essex
  • Architect: Saunders
  • Structural Engineer: Purestructures
  • Commenced: Jan 2024
  • Completed: May 2024
  • Procurement Method: Single stage drawing and spec.
  • Contract Value: £1,070,000

Challenges and Constraints

  • Working around a live car dealership
  • Segregation to the public
  • Very tight access with limited working space.
  • Live services serving other parts of the dealership.

Processes and methods.

Refurbishment comprised of full M & E installation including new lighting ventilation and heat recovery units, fully tiled showroom floors, new ceilings and full decoration. New doors were installed removing sections of curtain walling. Floor coverings were installed to areas not tiled.

Environmental
As responsible contractors who are ISO14001 accredited, we completed environmental risk assessments, minimise waste and any waste is disposed of using licensed companies. Waste is sorted at the collection depot. Typically, 90% of waste is recycled.

Toomey Basildon Toomey Basildon Toomey Basildon Toomey Basildon Toomey Basildon

What Our Clients Say

  • “Peter was outstanding when it came to communications and implementing changes and fixes that were required by the building work supplier. Very happy to recommend Gipping's services to others.”

    Oliver Squirrell, Old Jet Airspace Programme

  • “I just wanted to thank you again for pretty much everything! I absolutely love our home and it was totally worth the wait. There isn’t a single thing I’d change, it really is perfect. The landscapers have been now too and it’s totally transformed the outside space, it just looks incredible. I feel super lucky to live here, every time I pull up back home I smile and feel so grateful and lucky.  All the workmen have been incredibly lovely and gone above and beyond too, you have such a great team of people, they are extremely lovely and that makes a huge difference. I wish you well in all that you do creating beautiful homes for people. Thank you so so much.”

    Kayleigh Williams: Wix

  • “As a team, Gipping met every expectation throughout the project. Steve James provided the exact role and attitude required for a project of this nature. The way he managed the works on site, given the difficult “live” environment was a credit to the firm. The overall management and support for Steve from Steve Offord and Joe was also a large factor in the smooth running of the scheme. All involved should be commended and are a credit to Gipping. Thank you for your part in a very successful scheme.”

    Ben Mitchell, The Design partnership: Walden Place

  • “Carl, and the team, were fantastic during this phase of the project. Carl kept us updated with how the work was going and always had time to check with us if he thought things would impact on the running of the school. The site was always clean and tidy. The project was delivered slightly ahead of schedule, which made the transition into the build much easier for us! Thank you!”

    Hannah Brookman, Tollgate Primary School Phase I

  • “It was a pleasure working with Gipping and we are very happy with our new home. Shaun Whiting was an exceptional Site Manager and remained professional, approachable and friendly throughout the entire build. The site was always tidy, well-managed and busy. We felt as if the entire Gipping team took our project seriously and truly cared about getting the build right. I would highly recommend you to anyone who is considering building a home.”

    Elizabeth Goodrich, Amento