Paul Howes

Civil Engineering Manager

Paul was a groundworker from a young age and gained knowledge from a variety of projects which have proved invaluable in his career and on challenging groundwork projects.
As a driven individual who enjoys training and gaining knowledge in new ways of working, Paul has successfully managed the groundworks on a number of our projects and is now our Civil Engineering Manager.

In addition to Paul’s project resume below for Gipping, he has also worked on:

Traveller’s site at Colchester. Value: £4,500,000
Essex Highway works for access including a 200m footpath and bell mouth, drainage works, earthworks with bund and road widening, all to adoptable Highway’s standard

Wade international, Halstead Extension to factory and carpark.
The groundworks involved drainage, shuttered concrete retaining walls, bank retention with geo grid and concrete road forming.

Rayleigh Primary School
Concrete raft consisting of 10 ton of steel and 200m3 of concrete

Severalls Industrial Estate
Consisting of 3 No. phases from single story to 2 story office units with a selection of groundworks ranging from power float finished concrete to hard landscaping.

Qualifications:

NVQ Level 4 in Construction Site Supervision

CPCS Forward Tipping Dumper

CPCS Excavator

CPCS Ride on Roller

CITB Levelling and Setting Out CSCS

City & Guilds Specialised Plant and Machinery Operations

Temporary Works Supervisor and Co-Ordinator

Street works Excavation and Reinstatement– Location and Avoidance of Underground Apparatus and Monitoring Signing, Lighting and Guarding

SMSTS

First Aid at Work

Mobile Tower Scaffold Inspection

Asbestos Awareness

City and Guilds Confined Spaces – Medium Risk

HAV Awareness

Abrasive Wheels

Environmental Awareness

CAT and Genny Course

Manual Handling

Telehandler

Confined Spaces

Forward Tipping Dumper – wheeled /trackedRT09

Excavator 360 below / above- RT59

Ride on Roller – TR31

External Walls Seminar (NHBC)

Fire Warden

NFB Lean Construction

SWQR

COSHH

Working at Height

Qualifications:

NVQ Level 4 in Construction Site Supervision

CPCS Forward Tipping Dumper

CPCS Excavator

CPCS Ride on Roller

CITB Levelling and Setting Out CSCS

City & Guilds Specialised Plant and Machinery Operations

Temporary Works Supervisor and Co-Ordinator

Street works Excavation and Reinstatement– Location and Avoidance of Underground Apparatus and Monitoring Signing, Lighting and Guarding

SMSTS

First Aid at Work

Mobile Tower Scaffold Inspection

Asbestos Awareness

City and Guilds Confined Spaces – Medium Risk

HAV Awareness

Abrasive Wheels

Environmental Awareness

CAT and Genny Course

Manual Handling

Telehandler

Confined Spaces

Forward Tipping Dumper – wheeled /trackedRT09

Excavator 360 below / above- RT59

Ride on Roller – TR31

External Walls Seminar (NHBC)

Fire Warden

NFB Lean Construction

SWQR

COSHH

Working at Height

What Our Clients Say

  • “Peter was outstanding when it came to communications and implementing changes and fixes that were required by the building work supplier. Very happy to recommend Gipping's services to others.”

    Oliver Squirrell, Old Jet Airspace Programme

  • “I just wanted to thank you again for pretty much everything! I absolutely love our home and it was totally worth the wait. There isn’t a single thing I’d change, it really is perfect. The landscapers have been now too and it’s totally transformed the outside space, it just looks incredible. I feel super lucky to live here, every time I pull up back home I smile and feel so grateful and lucky.  All the workmen have been incredibly lovely and gone above and beyond too, you have such a great team of people, they are extremely lovely and that makes a huge difference. I wish you well in all that you do creating beautiful homes for people. Thank you so so much.”

    Kayleigh Williams: Wix

  • “As a team, Gipping met every expectation throughout the project. Steve James provided the exact role and attitude required for a project of this nature. The way he managed the works on site, given the difficult “live” environment was a credit to the firm. The overall management and support for Steve from Steve Offord and Joe was also a large factor in the smooth running of the scheme. All involved should be commended and are a credit to Gipping. Thank you for your part in a very successful scheme.”

    Ben Mitchell, The Design partnership: Walden Place

  • “Carl, and the team, were fantastic during this phase of the project. Carl kept us updated with how the work was going and always had time to check with us if he thought things would impact on the running of the school. The site was always clean and tidy. The project was delivered slightly ahead of schedule, which made the transition into the build much easier for us! Thank you!”

    Hannah Brookman, Tollgate Primary School Phase I

  • “It was a pleasure working with Gipping and we are very happy with our new home. Shaun Whiting was an exceptional Site Manager and remained professional, approachable and friendly throughout the entire build. The site was always tidy, well-managed and busy. We felt as if the entire Gipping team took our project seriously and truly cared about getting the build right. I would highly recommend you to anyone who is considering building a home.”

    Elizabeth Goodrich, Amento